Where is the sewer going to be located?
Phase 1, the current proposed upgrade, includes the installation of two pump stations at the two existing septic tanks, the construction of a pressurized sewer pipe to transport the septic tank effluent from the pump stations to a new disposal field and the construction of a new disposal field at the proposed site south-east of Honeymoon Bay. The exact location of the pressurized pipe is still to be determined through the engineered design. Where possible, the pipe will be located within road allowances and alleys.

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.
38.
39.
40.
41.
42.
43.
44.
45.
46.
47.
48.
49.
50.
51.
52.
53.
54.
55.
56.
57.
58.
59.
60.
61.
62.
63.
64.
65.
66.
67.
68.
69.
70.
71.
72.
73.
74.
75.
76.
77.
78.
79.
80.
81.
82.
83.
84.
85.
86.
87.
88.
89.
90.
91.
92.